Vugen Citrix Script does not run in BPM 9.03

Hello,
I've recorded a Citrix protocol script that works fine when manuallly played on Vugen 11.03.

After loading the script to the BAC and deployed to the BPM, the script seems to fail.

The error I receieve on the BPM is:
20/03/2012 09:08:36 Action.c(7): Error: Connect can not be established - Last Error=64, Last client error=0 [MsgId: MERR-91996]
20/03/2012 09:08:36 Action.c(7): Continuing after error in Vuser script. [MsgId: MMSG-10678]
20/03/2012 09:08:36 Action.c(7): Wake Up and check new event. [MsgId: MMSG0]
20/03/2012 09:08:36 Action.c(7): Number of currently used GDI handles on this machine = 42 [MsgId: MMSG0]
20/03/2012 09:08:36 Action.c(7): Error: ctrx_set_connect_opt("Outlook_8h10merc7.ica") failed. Operation exceeded timeout.

Regards,
Omri