Why am I receiving a warning email stating that no results have been delivered from an Execution Definition?

0 Likes

Problem:

Why am I receiving a warning email stating that no results have been delivered from an Execution Definition?

Resolution:

ANSWER
----------------------------------

If after a defined length of time no results have been delivered to SCTM from an Execution Definition run ( see below for example of email ), then a warning email will be sent to the user that last changed the execution definition.

This time can be changed by editing the TMAppServerHomeConf.xml file.

It is located in directory: C:\Program Files\Borland\SC Test Manager xxxx\conf\appserver

The relevant lines of code in the xml file are:


10


In this code the time is 10 minutes.

Email Example

-------------------------------------------------------
SilkCentral Test Manager - Borland Software Corporation
-------------------------------------------------------

Execution results were not received from the below-listed execution definition within its specified time limit. Please visit Test Manager"s Activities page (via the following link) to determine if there is a problem with this execution:
http://machinename :19120/silk/DEF/TM/Projects?pId=10&prtab=2

-------------------------------------------------------
Execution Details
-------------------------------------------------------
Execution Definition: DataDrive Execution
Planned Start Time: Thu, Dec 20, 2007 - 12:36:29 AM
Execution Server: localhost (Application Server)
Specified Time Limit: 5

Old KB# 25001