Idea ID: 2870393

Give ability to limit over-allocation of resources

Status : Waiting for Votes
2 months ago

Provide within PPM the ability to limit the allocation of resources to a maximum percentage of capacity.  

As an example, Resource A is currently allocated at 50% from now through the end of 2021.  A New Demand comes in for a full time resource for the next 12 months, and it is determined that Resource A is a fit to fill and the Demand is allocated at 100% to this new demand, so now Resource A is showing to be 150% allocated to work through the end of 2021.  

The ask here is that a maximum Allocation % be set so that a warning/error message could be displayed advising that the allocation is over the maximum allocation that is allowed.  This maximum could be set either at an instance wide level, or potentially at a Resource Pool Level or at a Resource Level.  The instance wide level would be the default unless it was overridden at a Resource Pool or Resource Level to be a different percentage

Labels:

Feature Request