Application Delivery Management
Application Modernization & Connectivity
CyberRes
IT Operations Management
Instructions for migrating resources from an existing Oracle-based ESM 5.x to ESM 6.0c with CORR-Engine. This is not a full event data migration. An additional migration procedure is required to bring the installation to ESM 6.5c. See the ESM 6.5c Upgrade Guide for instructions to upgrade from ESM 6.0c to ESM 6.5c.