Hi,
I have a query that do we have a max number of tests that can be there in a suite? I have around 3000 tests in a suite and when I try to run them, I get 500 error from Octane. Because when I create a suite run, it automatically generates 3000 manual runs - which takes a lot of time and in the mean time script times out.
Is there a limit or any solution to such issue?