List of Short cuts in PPMC

Jump to solution

Hi

 

Could you please provide list of short cuts in PPMC and there uses?

 

For best practice and it support our process.

 

for example.

 

1. Creating multiple project

2. Change of position end date in Details tab

 

change of postion end date i have attached document for your reference

 

please do needful

 

 

 

Labels (1)
0 Likes
1 Solution

Accepted Solutions
Highlighted
Absent Member.
Absent Member.
Hi Mike

Really thank you very much

i had doubt we can create the multiple project in this same method

View solution in original post

0 Likes
6 Replies
Highlighted
Contributor.
Contributor.

Hi,

 

There are not any short cut features in PPM that I am aware of (sound like Enhancement Requests).

 

Take a look at the Project Management User/Configuration Guides and the Resource Management User/Configuration Guides.

 

These would have the basic functionalities of the PPM product for those part of the product.

 

-Mike

 

 

“HP Support
If you find that this or any post resolves your issue, please be sure to mark it as an accepted solution.”
0 Likes
Highlighted
Absent Member.
Absent Member.
Hi Mike

Could you please provide me one or two shorts in PPMC

it would help me to move to next level

regards,
J. Revathy
0 Likes
Highlighted
Contributor.
Contributor.

Hi,

 

I do not think PPM has any shorts.

 

What exactly is a short?

 

Just want to make sure I completely understand the questions.

 

Thanks,

Mike

“HP Support
If you find that this or any post resolves your issue, please be sure to mark it as an accepted solution.”
0 Likes
Highlighted
Absent Member.
Absent Member.
Hi Mike

i have attached the document in the previous reply
for changing position end date for 200 line items
we are doing manually
is there is any short cut for this
0 Likes
Highlighted
Contributor.
Contributor.

Oh sorry, I did not see that attachment.

 

The Field looks to be one that was added to the Request Type that is being used with the Project.

 

If the Request Type's Field was configured to be used in Searches, can do a Mass Update:
1) Search | Requests

2) Enter a specific Request Type

3) Click on the Advanced Search button

4) Click on the Search button

5) Select the Requests that need to be editied

6) Select Edit | Mass Update

7) Look for the Field to make the change and then Save

 

-Mike

“HP Support
If you find that this or any post resolves your issue, please be sure to mark it as an accepted solution.”
0 Likes
Highlighted
Absent Member.
Absent Member.
Hi Mike

Really thank you very much

i had doubt we can create the multiple project in this same method

View solution in original post

0 Likes
The opinions expressed above are the personal opinions of the authors, not of Micro Focus. By using this site, you accept the Terms of Use and Rules of Participation. Certain versions of content ("Material") accessible here may contain branding from Hewlett-Packard Company (now HP Inc.) and Hewlett Packard Enterprise Company. As of September 1, 2017, the Material is now offered by Micro Focus, a separately owned and operated company. Any reference to the HP and Hewlett Packard Enterprise/HPE marks is historical in nature, and the HP and Hewlett Packard Enterprise/HPE marks are the property of their respective owners.