Idea ID 2781597
Allow scheduling of DAU content separately
As a patch administrator with bandwidth restrictions I would like the ability to schedule only DAU data to be replicated at a specific time so that I can get that content replicated to satellites as quickly as possible.
Labels
- Labels:
-
Patch Content
1 Comment
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.