I have a requirement to change the incident status from "Pending Customer" to "Work in Progress" when an end user updates the related interaction in ESS.

Currently, when engineer needs more info, they update the incident and change status to "Pending Customer", and ESS user receives the email to input theie update n ESS.  Once the user updates the SD ticket in ESS,the related Incident status should change to "Work in Progress".

HPSM Codeless 9.41..5006

0 Likes
1 Solution

Accepted Solutions
Highlighted
Honored Contributor.. Honored Contributor..
Honored Contributor..

Since we are using Codeless version, i wanted to make use of RuleSets to accomplish this task. This is my solution

1) Create 3 new Rule Sets "Rule Set 1", "Rule Set 2", "Rule Set 3"
2) Call "Rule Set 1" from Interaction Workflow (Workflow Based Rule Sets-->After successful update)
3) Create a "Run Action" inside "Rule Set 1"

Details of "Run Action" is

Run Action On = "Related Records"
Relation Type = "Related Incidents"
Run Rule Set = "Rule Set 2"
Action after Rule Set = "Do nothing"

4) Inside "Rule Set 2" create a "Run Scheduled Action"

Details of "Run Scheduled Action" is

Calculation Type = "Usa Javascript"
Javascript = actionExecutionTime=new Date();
Action Condition = ( Status in CurrentRecord = "Pending Customer")
Run Rule Set = "Rule Set 3"

5) Inside "Rule Set 3", create a Rule called "Set value"

Details of Set value

Condition = ( Status in CurrentRecord = "Pending Customer")
Filed Name = Status
value= "Work In Progress";

A schedule record is created for each of the related incidents with schedule class as "scheduledAction". This way even there is lock on the related incidents the schedule record will be rescheduled.

View solution in original post

0 Likes
4 Replies
Highlighted
Acclaimed Contributor.
Acclaimed Contributor.

Common scheme:

User update INTERACTION through the form - ess.SD.update.browse

Use FC for this form to verify that a user has updated a required field.

If updates are made, then run JS (FC-Calculations), where find related incidents and change status for it.

=====

specify whether you want more explanations

Highlighted
Honored Contributor.. Honored Contributor..
Honored Contributor..

Thanks for the reply. Only problem i have with this approach is if there is lock on the incident record then the js call will fail to update the incident, or the user currently working on the incident might see "Record has been modified, HPSM will load the latest record".

0 Likes
Highlighted
Acclaimed Contributor.
Acclaimed Contributor.

Then next method:

1) Trigger for interaction when user has made chahges in ESS start SCHEDULER

2) SCHEDULER run IOACTION

3) IOACTION contains the script which performs the necessary changes and in case of failure creates a new SCHEDULER

and so steps 2, 3, repeat until not updated

0 Likes
Highlighted
Honored Contributor.. Honored Contributor..
Honored Contributor..

Since we are using Codeless version, i wanted to make use of RuleSets to accomplish this task. This is my solution

1) Create 3 new Rule Sets "Rule Set 1", "Rule Set 2", "Rule Set 3"
2) Call "Rule Set 1" from Interaction Workflow (Workflow Based Rule Sets-->After successful update)
3) Create a "Run Action" inside "Rule Set 1"

Details of "Run Action" is

Run Action On = "Related Records"
Relation Type = "Related Incidents"
Run Rule Set = "Rule Set 2"
Action after Rule Set = "Do nothing"

4) Inside "Rule Set 2" create a "Run Scheduled Action"

Details of "Run Scheduled Action" is

Calculation Type = "Usa Javascript"
Javascript = actionExecutionTime=new Date();
Action Condition = ( Status in CurrentRecord = "Pending Customer")
Run Rule Set = "Rule Set 3"

5) Inside "Rule Set 3", create a Rule called "Set value"

Details of Set value

Condition = ( Status in CurrentRecord = "Pending Customer")
Filed Name = Status
value= "Work In Progress";

A schedule record is created for each of the related incidents with schedule class as "scheduledAction". This way even there is lock on the related incidents the schedule record will be rescheduled.

View solution in original post

0 Likes
The opinions expressed above are the personal opinions of the authors, not of Micro Focus. By using this site, you accept the Terms of Use and Rules of Participation. Certain versions of content ("Material") accessible here may contain branding from Hewlett-Packard Company (now HP Inc.) and Hewlett Packard Enterprise Company. As of September 1, 2017, the Material is now offered by Micro Focus, a separately owned and operated company. Any reference to the HP and Hewlett Packard Enterprise/HPE marks is historical in nature, and the HP and Hewlett Packard Enterprise/HPE marks are the property of their respective owners.